• ISTANBUL AIRPORT
    THE BEST BRANDS TAKE PLACE
    IN THE BIGGEST PROJECTS

28

YALÇIN BORU JEOTERMAL was established in 1997, on a total area of 23,000 m² with 7,200 m² indoor area, with the purpose of meeting the requirements of the industry at the utmost level.

CORPORATE

Taking place within the body of DOĞAN JEOTERMAL operating as the leading corporation in Geothermal Energy industry, YALÇIN BORU JEOTERMAL has been carrying out the manufacturing of Standard Type Pre-insulated Pipe (Geothermal Pipe) and fittings, Industrial Type (rock wool reinforced) Insulated Pipe and fittings, Pre-insulated Flexible Plastic Pipes (PP-R, Glass Fibre Reinforced PP-R, HDPE) and fittings, and Polyethylene Pipe (PE 100) and fittings for a period of more than 24 years.

Started its manufacturing activities in 1997 in Ankara İvedik Organised Industrial Zone and started continuing its activities in Polatlı Organised Industrial Zone on an area of 23,000 m² in 2000, Yalçın Boru operates by using the technology that is the requirement of the era at the utmost levels in accordance with the manufacturing standards EN 253, EN 448, EN 15632 and EN 12201-2 with its expert staff in their fields.

In addition, as a TSE-certified organisation, rendering service in accordance with the standards ISO 9001, ISO 14001 and ISO 45001, Yalçın Boru adopts the concept of high quality production and service and accordingly avoids compromising from customer satisfaction.

Yalçın Boru provides services mainly in geothermal energy and in many sectors such as district heating and cooling, energy generation, construction, greenhouse cultivation, tourism and maritime, by prioritising the principles of quality and customer satisfaction, and takes part in many important domestic and international projects.

PRODUCTS
PRE-INSULATED STEEL PIPES
PRE-INSULATED STEEL PIPES
(STANDARD TYPE)
Upgrade your piping system with pre-insulated steel pipes. Visit Yalçın Boru for high-quality and efficient solutions to meet your project requirements.
ROCKWOOL REINFORCED PRE-INSULATED SEAMLESS STEEL PIPES
Explore our page for rockwool reinforced pre-insulated seamless steel pipes. Yalçın Boru offers durable and efficient solutions for your piping needs.
PRE-INSULATED GALVANISED STEEL PIPES
Yalcin Boru is one of the leading manufacturers, exporters and suppliers of pre-insulated galvanised steel pipes, fittings and price.Turkey
PRE-INSULATED PLASTIC PIPES
Find high-quality pre-insulated geothermal plastic pipes at Yalçın Boru. Explore our page for reliable and efficient solutions for your piping needs.
  • POWER PLANTS
  • DISTRICT HEATING & THERMAL WATER DISTRIBUTION SYSTEMS
  • INDUSTRIAL FACILITIES & PROJECTS
  • AIRPORTS & TRANSPORTATION PROJECTS
  • PUBLIC BUILDINGS & COMPLEX BUILDINGS
  • TOURISM
  • GREENHOUSING
  • UNIVERSITIES
  • SHIPBUILDING INDUSTRY
References
SANKO ENERGY SANKO ENERGY
ZORLU ENERGY ZORLU ENERGY
ÇELİKLER HOLDİNG ÇELİKLER HOLDİNG
TÜRKERLER ENERGY TÜRKERLER ENERGY
  • MİS 1 GEOTHERMAL POWER PLANT (12,5 MW), MİS 3 JES (48 MW)
  • SALİHLİ GEOTHERMAL POWER PLANT 1 (15 MW), SALİHLİ GEOTHERMAL POWER PLANT 2 (25 MW), SALİHLİ GEOTHERMAL POWER PLANT 3 (30 MW)-SANKO HOLDİNG
  • KIZILDERE 3 GEOTHERMAL POWER PLANT (165 MW), ALAŞEHİR 1 GEOTHERMAL POWER PLANT (45 MW) - ZORLU HOLDİNG
  • GREENECO GEOTHERMAL POWER PLANT 1-2 (26 MW), GREENECO GEOTHERMAL POWER PLANT 3-4 (26 MW), GREENECO GEOTHERMAL POWER PLANT 5 (28,5 MW)
  • PAMUKÖREN GPP1(67 MW), PAMUKÖREN GPP4(32 MW), SULTANHİSAR GPP(14 MW), SULTANHİSAR GPP2(22 MW)-ÇELİKLER HOLDİNG
  • ALAŞEHİR GEOTHERMAL POWER PLANT (24 MW), TÜRKERLER GEOTHERMAL POWER PLANT 3 (120 MW) - TÜRKERLER HOLDİNG
  • KARYEK UMURLU GEOTHERMAL POWER PLANT 1 (12 MW), UMURLU GEOTHERMAL POWER PLANT 2 (12 MW)
  • KUYUCAK GEOTHERMAL POWER PLANT (18 MW)
  • 3S KALE GEOTHERMAL POWER PLANT 1 (25 MW)
  • TOSUNLAR 1 GEOTHERMAL POWER PLANT (4 MW)
  • ÖZMEN 3 GEOTHERMAL POWER PLANT (19 MW)
  • BUHARKENT GEOTHERMAL POWER PLANT (14 MW)
  • KUBİLAY GEOTHERMAL POWER PLANT (24 MW)
  • BABADERE JES (8,5 MW)
  • DENİZ JES (24 MW), KEREM JES (24 MW), MELİH JES (33 MW)
  • TUZLA GEOTHERMAL POWER PLANT (7,5 MW)
SHOW ALL
Last Blogs
Benefits of Geothermal (Pre-Insulated - Heat Insulated) Pipes
Geothermal piping - by using pre-insulated (thermally insulated) pipes you can achieve optimum benefits in retaining fluid heat. Benefits of heat insulated pipes:
Pre-Insulated Pipe Jointing Set -Pre-Insulated-Geothermal Pipe
With the pre-insulated pipe jointing set,pipe jointing can be done while preserving the insulation of the installation.Thermal insulated geothermal pipe jointing set
HDPE Pipe Diameters
HDPE Pipe Diameters
How does geothermal energy pipes impact the economy
Gepothermal energy pipes in Turkey; how geothermal energy boosts Turkey's economy. Explore the impact and growth of geothermal power plants in the country.
;
Online WhatsApp Chat